The MCBs needs to be clipped on to the Din bar and also the busbar into a latest flowing terminal and limited screwed to present current towards the MCBs.Two 16/25mm tail cables, 1 neutral and another active are connected to the main double pole switch from the meter. The primary https://charlielbpcp.bloguerosa.com/34290103/the-best-side-of-outdoor-security-lighting-installer