Early pile driving was performed by hand. The Electrical power needed to travel a pile was established by the burden of the ram falling from the gravity subject. The casing is often embedded 30 cm to the dense layer, making certain isolation with the overburden. This also allows grouting with https://bangkokwax60257.suomiblog.com/the-2-minute-rule-for-pile-50998029