The main park includes a potential of two hundred MW whilst Sandrini II features a potential of one hundred MW. The full cost of both equally assignments weren't disclosed even so, in the course of development, in excess of 200 personnel ended up used. The projects are envisioned to check https://bestsolarinstallationcalifornia.fitness.blog/2024/09/13/4-tips-to-hire-the-best-commercial-solar-contractors/